043Weather has hampered efforts thus far, and concrete demo work was slow to start.  However, steel framing for both side canopies is essentially complete.Preparations have been made for the new concrete slab in front.

Steel stud framing, electrical rough-in and concrete work will begin next week.

014This project is being delivered through the Design-Build contract arrangement with Gontram Architecture and Ten Penny Construction, Inc., providing the Owner with a single-source, turn-key project.