Michael Jordan Nissan – 007


001Building momentum!

This week saw the installation of the light gauge metal framing over most of the front and left side facades.  The existing structure along the front wall, bows in approximately 2 inches, but will not be visible since the new framing is perfectly straight.

Concrete sidewalks were installed on the left side of the building as well.

Framing inspections and sheathing are expected next week.003

This project is being delivered through the Design-Build contract arrangement with Gontram Architecture and Ten Penny Construction, Inc., providing the Owner with a single-source, turn-key project.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s