Michael Jordan Nissan – 009


Insulation installed. Sheathing underway.

Framing inspections passed this week.  Insulation and sheathing work immediately followed.

Due to the nature of the existing wall framing, insulation has to be installed from the exterior, before the building is dried in.  The obvious issue is that insulation needs to be inspected before it can covered up.  It needs to be covered up in order to stay dry.  Therefore, as soon as the framing was signed off, insulation began and was also signed off.

Insulated wall waiting for sheathing.

Next week, storefront work begins along with exterior foam board insulation.  Exterior concrete work will also continue.

This project is being delivered via Architect-led Design-Build to provide single-source, turnkey design and construction services.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s