Michael Jordan Nissan – 011


Foam board insulation installation

Foam board insulation covers most of the Showroom expansion area, but was slow-going with the steel z-furring required by the ACM panels (coming in a few weeks).  Aluminum storefront window replacement began this week and progressed nicely.  Waiting on curtainwall materials to arrive, then the place will really start taking shape.  Site concrete is almost complete.

Concrete vehicle display area with landscape planter wall

This part of the project has been making everyone anxious to get it up and complete, but with the materials involved and the joint placement critical to the overall Gensler concept, we have to travel in small steps, with one foot in front of the other.  While we wish we could pre-order materials with established dimensions so that the whole thing could go up in a week, that is simply not the case.  We are still moving as fast as possible, and the folks at Michael Jordan Nissan have been awesome to work with!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s