Michael Jordan Nissan – 018


ACM panels surround the Entry Element

ACM panels surround the Entry Element

ACM panel installation began this week.  With the “Entry Element” arriving last week, it was just a matter of time before the aluminum composite material panels were delivered and began transforming the front of the building.  As beautiful as Tyvek is (sic), it sure is a welcome change.

Louver brackets are installed, and the louvers are going up now.

Inside most of the above-ceiling work is complete with the exception of the light fixtures, which are due to arrive today.

ACM panels

ACM panels

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s