Sigma Nu – NCSU – 007


Stair shaft (left) and Elevator shaft (right)

Stair shaft (left) and Elevator shaft (right)

Concrete masonry towers are reaching towards the sky!  This week, CMU is in full swing, with the elevator shaft and stair tower expected to top out by tomorrow (weather permitting – Ugghh!).

Next week will bring underslab plumbing work and ground floor slab prep work.

For more information on the project, please check out our Website.

Formwork has been stripped from the retaining wall.  Stair tower and elevator shaft are in the background.

Formwork has been stripped from the retaining wall. Stair tower and elevator shaft are in the background.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s