Michael Jordan Nissan – 031


Ceramic tile and cabinetry work in the restrooms

Ceramic tile and cabinetry work in the restrooms

Ceramic tile work is in full swing, but going slow.  Floor tile and wall tile installation is complete in the restrooms allowing cabinetry and toilet partition work to begin.

Also this past week, interior aluminum framing was installed.  Ceiling tiles were also dropped into place.

Finally, more CREE pole lights were installed in the parking lot.

3-headed CREE light pole.

3-headed CREE light pole.

Next week, the floor tile will be installed in the Showroom.  Several thousand square feet of ceramic tile will take some time.This project is being delivered through an Architect-led Design-Build process with Gontram Architecture and Ten Penny Construction, Inc.

Interior aluminum storefront work

Interior aluminum storefront work

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s