Sigma Nu – NCSU – 009


023

Concrete is finished with power float.

Last bit of concrete is placed.

Last bit of concrete is placed.

013

Retaining wall waterproofing is almost complete.

The Sigma Nu Fraternity House project passed another milestone today.  The concrete slab on the 1st floor was poured!

The basement retaining wall has been waterproofed and protected with insulation board and drainage mat.  A footing drain will be installed soon.  The wall will be backfilled after the steel is set and slab poured later this month.

For more information on the project, please check out our Website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s