Suspended decking is in place.

Suspended decking is in place.

Progress continues for the Sigma Nu Fraternity House project at NC State University.

The suspended slab decking is installed and ready for a pour later this week or early next week.  Sheer studs are installed and inspected.  Cable guardrail surrounds the perimeter of the suspended 2nd floor.

Sheer studs welded in place as part of composite slab.

Sheer studs welded in place as part of composite slab.

Once the 2nd floor is poured, the basement retaining wall will be backfilled and wood framing will begin.

For more information on the project, please check out our Website.

Sample panel with brick and cast stone.

Sample panel with brick and cast stone.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s