Michael Jordan Nissan – 035


LED Cloud fixtures overhead, ceramic tile work below

LED Cloud fixtures overhead, ceramic tile work below

More work this past week putting final touches on the new and expanded Showroom for Michael Jordan Nissan in Durham, NC.

The Nissan “cloud” fixtures were installed.  This is particularly exciting since the usual way to do this is with a large array of 2×4 fluorescent troffer fixtures.  However, in this instance, CREE has successfully lobbied to allow their LED fixture be used in place of fluorescents – a first for Nissan.  2×4 LED troffer fixtures are installed to provide a much more even light quality, with longer life and lower energy usage as added benefits.

Ceramic tile work continues as the flooring is extended into the front half of the Showroom.

LED Cloud fixtures

LED Cloud fixtures

This project is being delivered through an Architect-led Design-Build process with Gontram Architecture and Ten Penny Construction, Inc.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s