Sigma Nu – NCSU – 012


Second floor slab wet curing under poly

Second floor slab wet curing under poly

More progress this week, but a whole lot more activity is just over the horizon!

On Monday, the 2nd floor slab was poured.  The composite slab is composed of 5″ thick slab held to the structure by welded studs (lots of them).

Foundation wall backfilled with stone on top of footing drain.

Foundation wall backfilled with stone on top of footing drain.

Now that the slab is poured, the retaining wall can be backfilled.  Subsurface drainage is installed where backfill operations are underway.

The past week was also spent preparing to start 2nd floor wall framing next week.  In a few weeks, the entire mass of the house should be readily apparent.  That will be exciting.

For more information on the project, please check out our Website.

LVL's and steel plates await framing next week.

LVL’s and steel plates await framing next week.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s