Sigma Nu – NCSU – 028


Masonry at bay window complete.

Masonry at bay window complete.

The Sigma Nu Fraternity House project at North Carolina State University has picked up momentum on the interior.  Rough-in inspections have been signed off to allow sheetrock installation on the underside of the floor-ceiling assembly between the 2nd and 3rd floors.

On the exterior, the curved stone pieces arrived for the bay window, which were promptly installed to give the exterior a close-to-finished appearance.

The cast stone trim work was also completed around the front entry on the 2nd floor.

Front entry masonry complete.

Front entry masonry complete.

Completion date is tentatively scheduled for mid-December of 2013.For more information on the project, please check out our Website.

Sheetrock underside of fire-rated floor-ceiling assembly.

Sheetrock underside of fire-rated floor-ceiling assembly.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s