The NC Retail Merchants Association project in downtown Raleigh, NC is a few mere weeks from completion.

There is still a lot to do, but steady progress is being made.  Above ceiling inspections are being obtained today and early next week.  Ceiling tile installation can proceed as soon as possible.

Wood trim installation, painting, etc. are at a fever pitch.

New break room, kitchenette, and copy room cabinetry are due to arrive and be installed next week.  Floor finishes are also scheduled next week.

The owner’s telecom contractors have run cable above ceiling and are ready to terminate connections.

Insulation awaits installation above ceiling

Insulation awaits installation above ceiling

Construction is slated to be complete by June 30th.  Because of the accelerated schedule, the design-build process made the most sense to NCRMA.  Gontram Architecture and Ten Penny Construction have once again teamed up for this unique Design-Build opportunity.  As a single-source delivery method, we control budget and schedule, taking a lot of the usual Owner-associated worry out of the project.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s